Q-2, r. 9.01 - Design code of a storm water management system eligible for a declaration of compliance

Full text
139. The cross section of the floor of the grassed ditch must be smooth over the width of the ditch.
O.C. 871-2020, s. 139.
In force: 2020-12-31
139. The cross section of the floor of the grassed ditch must be smooth over the width of the ditch.
O.C. 871-2020, s. 139.